Building a mini-grid is expensive, and rural customers can only pay so much. Public programmes help close that gap, so private developers can bring power to places the market alone wouldn't reach. In Nigeria, both programmes are run by the Rural Electrification Agency (REA).

The Nigeria Electrification Project (NEP)

NEP was the first large programme. It was funded with $350 million from the World Bank and $200 million from the African Development Bank. Its mini-grid support used performance-based grants: developers received money for each new customer connection, but only after the connections were built and independently checked.

A December 2024 World Bank progress report recorded 118,123 connections verified and paid under the performance-based grant part of the programme.

DARES: the next, larger phase

The Distributed Access through Renewable Energy Scale-up (DARES) project builds on NEP:

Two ways DARES funds mini-grids

RouteHow it works
Performance-based grant (PBG)A set grant, paid per new connection for isolated mini-grids, or per unit of capacity for interconnected ones. Paid in stages after results are verified.
Minimum subsidy tender (MST)Developers compete for a group of sites. The one asking for the lowest subsidy wins.

What this means for a developer

The takeaway: DARES makes mini-grids more affordable to build, but it rewards developers who are well prepared. We are designing our projects to meet its requirements. We have not applied for or received any DARES funding.